The work on the final stabilization work of the pillars in the body of the naves was carried out during a first phase, consisting of the construction of a set of supporting arches to join the footings of the pillars and the foundations of the outer walls forming a framework to stabilize these foundations and prevent any possible lateral failure. A wooden framework was placed on these arches and, later, the finish and the necessary installations for the purposed required.