As a final structural stabilization task, the northeast corner of the gable end of the transept has been repaired, with its buttress resting on the closing wall of its north chapel. There have been repairs to cracks and displaced building materials, an injection of hydraulic lime fluid mortars throughout the area affected by structural damage, and the openings in the north wall have been repaired, partially closing the one that was opened in the restoration of 1960 and reopening the one that had closed prior to this work, thus recovering the order of the original arrow slits of the lower crypt.